How We Deliver

One project director, one baseline, and a review discipline that every deliverable passes before it reaches the owner.

DKC organizes its work by project stage. Each stage closes with a decision that the owner takes, and every deliverable that supports it has passed DKC's review.

WHY IT MATTERS

A large power or environmental project involves the owner, an engineering manager and advisor on the owner's side, contractors, lenders, and the lenders' independent engineer, each with a different job at each stage. Projects slip when those roles blur, or when a decision is taken before the work behind it is complete.

DKC keeps the roles explicit: the owner decides; DKC manages the engineering on the owner's side, from the feasibility study through design, construction, and commissioning; the contractors design and build; and an independent engineer appointed by the lenders reviews the project for them. DKC does not review its own work.

WHAT THE OWNER GETS

  • ✓A single point of accountability to the owner
  • ✓One baseline for design, cost, contracts, and the financial model
  • ✓Decisions taken at defined gates, with the evidence behind them
  • ✓Issues resolved at the lowest level that can close them

ROLES BY PROJECT STAGE

Who does what, from feasibility to commercial operation

The owner's decision closes each stage. DKC sets the technical baseline in the feasibility study and manages the engineering against it through procurement, construction, and commissioning. The independent engineer reports to the lenders.

PARTY

FEASIBILITY / BFS

FEL3 / PRE-NTP

LNTP / PROCUREMENT

FINANCIAL CLOSE

EXECUTION TO COD

Owner — decides and approves

Approves feasibility and BFS basis

Approves design basis; releases EPC tender

Awards EPC; authorizes long-lead procurement

Signs agreements; closes financing

Approves changes; accepts the plant

DKC — owner-side engineering manager and advisor

Leads the bankable feasibility study: design basis, cost estimate, market, contracts, and financial model

Design firm management; owner's requirements; tender packages

Bid evaluation; EPC negotiation support; model updated with bids

PPA / EPC terms; CP checklist; final model; lender coordination

Design and submittal review; interface control; construction monitoring; commissioning and performance-test witnessing; cost, schedule, and change control

Independent engineer (lenders')

Independent review of the feasibility study, where appointed

Reviews the design basis and specifications for the lenders

Independent review of design and procurement

Technical due diligence for lenders

Independent oversight of construction

EPC / EPCM contractors

—

Bids against tender packages

Critical engineering; long-lead orders

Contract and price input

Detailed design, construction, commissioning

BFS = bankable feasibility study; FEL = front-end loading; NTP / LNTP = (limited) notice to proceed; CP = condition precedent; COD = commercial operation date.

DELIVERY ORGANIZATION

One project director, three workstreams

DKC's project director is the owner's single point of accountability and leads the commercial and financing work. An engineering coordinator leads the technical workstream; a commercial and financial PMO supports documentation, reporting, and quality.

WORKSTREAM 1

Technical & engineering management

Power plant and CCS integration; boiler / CFBC; CCS process; electrical, I&C, and civil; OSBL integration and environmental systems; project controls and cost; constructability. Interface with technology suppliers and EPC / EPCM contractors.

WORKSTREAM 2

Commercial & contract advisory

Contract strategy, risk allocation, and alignment of the project agreements, led by the project director. Interface with the owner's legal, tax, and insurance advisors.

WORKSTREAM 3

Financial advisory & capital raising

Financing strategy, financial analysis, and lender engagement, led by the project director. Interface with lenders and their advisors.

REPORTING RHYTHM

A fixed rhythm the owner can plan around

WEEKLY

Coordination inside DKC

Workstream leads review progress, the interface register, and open issues against the integrated schedule.

MONTHLY

Progress report to the owner

Progress, cost and schedule status, key risks, and recommendations; instructions and approvals recorded in return.

AT EACH STAGE

Steering committee review

The owner's steering committee takes the stage decision on the evidence DKC has assembled, with funder reporting where required.

ISSUE ESCALATION

Issues are resolved at the lowest level that can close them

STEP 1

Raise and log

Every issue is logged in a single register with an owner and a due date.

WHO RESOLVES

Issue owner

TIME LIMIT

Logged on the day it is raised

STEP 2

Resolve in the workstream

If the issue sits within one workstream and the current baseline, the workstream lead closes it.

WHO RESOLVES

Workstream lead

TIME LIMIT

5 working days

STEP 3

Escalate to the project director

If it crosses workstreams or the baseline, the DKC project director resolves it.

WHO RESOLVES

DKC project director

TIME LIMIT

10 working days

STEP 4

Steering committee

If it changes scope, budget, risk allocation, or a stage date, the owner's steering committee decides.

WHO RESOLVES

Owner's steering committee

TIME LIMIT

Next committee or a special meeting

STEP 5

Close-out

Baseline, model, contracts, and schedule are updated; affected parties are notified; the independent engineer is informed where scoped.

WHO RESOLVES

DKC project director

TIME LIMIT

Recorded in the decision register

QUALITY REVIEW

A documented review procedure for every deliverable

Deliverables follow DKC's documented review procedure: review comments are logged and closed before a deliverable is issued for use.

STEP 1

Discipline review

Third-party deliverables are reviewed by DKC's discipline leads and checked against the interface register.

STEP 2

Originator, checker, approver

DKC's own documents pass a second professional's check and a director's approval; each issued model carries the cost-estimate revision it reflects.

STEP 3

Independent engineer

At the gates the owner or the lenders set, an independent engineer reviews the work and reports directly to them.

INDEPENDENCE

How we keep owner-side advice independent

DKC also advises contractors and equipment suppliers on other projects, and many of our engineers come from EPC contractors. These rules keep that experience from becoming a conflict.

ONE SIDE PER PROJECT

No work for bidders on the same project

Once DKC acts for an owner, it does not advise any bidder, contractor, or supplier on that project.

DISCLOSURE

Prior relationships disclosed

Before an engagement starts, DKC discloses any prior work for, or recent employment with, parties likely to bid or supply, and the owner decides how to handle it.

SEPARATE REVIEW

No review of our own work

Independent review of DKC's studies is carried out by an engineer outside DKC, appointed by the owner or the lenders.

See how this applies to each of our services.