DKC organizes its work by project stage. Each stage closes with a decision that the owner takes, and every deliverable that supports it has passed DKC's review.
WHY IT MATTERS
A large power or environmental project involves the owner, an engineering manager and advisor on the owner's side, contractors, lenders, and the lenders' independent engineer, each with a different job at each stage. Projects slip when those roles blur, or when a decision is taken before the work behind it is complete.
DKC keeps the roles explicit: the owner decides; DKC manages the engineering on the owner's side, from the feasibility study through design, construction, and commissioning; the contractors design and build; and an independent engineer appointed by the lenders reviews the project for them. DKC does not review its own work.
WHAT THE OWNER GETS
ROLES BY PROJECT STAGE
The owner's decision closes each stage. DKC sets the technical baseline in the feasibility study and manages the engineering against it through procurement, construction, and commissioning. The independent engineer reports to the lenders.
PARTY
FEASIBILITY / BFS
FEL3 / PRE-NTP
LNTP / PROCUREMENT
FINANCIAL CLOSE
EXECUTION TO COD
Owner — decides and approves
Approves feasibility and BFS basis
Approves design basis; releases EPC tender
Awards EPC; authorizes long-lead procurement
Signs agreements; closes financing
Approves changes; accepts the plant
DKC — owner-side engineering manager and advisor
Leads the bankable feasibility study: design basis, cost estimate, market, contracts, and financial model
Design firm management; owner's requirements; tender packages
Bid evaluation; EPC negotiation support; model updated with bids
PPA / EPC terms; CP checklist; final model; lender coordination
Design and submittal review; interface control; construction monitoring; commissioning and performance-test witnessing; cost, schedule, and change control
Independent engineer (lenders')
Independent review of the feasibility study, where appointed
Reviews the design basis and specifications for the lenders
Independent review of design and procurement
Technical due diligence for lenders
Independent oversight of construction
EPC / EPCM contractors
—
Bids against tender packages
Critical engineering; long-lead orders
Contract and price input
Detailed design, construction, commissioning
BFS = bankable feasibility study; FEL = front-end loading; NTP / LNTP = (limited) notice to proceed; CP = condition precedent; COD = commercial operation date.
DELIVERY ORGANIZATION
DKC's project director is the owner's single point of accountability and leads the commercial and financing work. An engineering coordinator leads the technical workstream; a commercial and financial PMO supports documentation, reporting, and quality.
WORKSTREAM 1
Technical & engineering management
Power plant and CCS integration; boiler / CFBC; CCS process; electrical, I&C, and civil; OSBL integration and environmental systems; project controls and cost; constructability. Interface with technology suppliers and EPC / EPCM contractors.
WORKSTREAM 2
Commercial & contract advisory
Contract strategy, risk allocation, and alignment of the project agreements, led by the project director. Interface with the owner's legal, tax, and insurance advisors.
WORKSTREAM 3
Financial advisory & capital raising
Financing strategy, financial analysis, and lender engagement, led by the project director. Interface with lenders and their advisors.
REPORTING RHYTHM
WEEKLY
Coordination inside DKC
Workstream leads review progress, the interface register, and open issues against the integrated schedule.
MONTHLY
Progress report to the owner
Progress, cost and schedule status, key risks, and recommendations; instructions and approvals recorded in return.
AT EACH STAGE
Steering committee review
The owner's steering committee takes the stage decision on the evidence DKC has assembled, with funder reporting where required.
ISSUE ESCALATION
STEP 1
Raise and log
Every issue is logged in a single register with an owner and a due date.
WHO RESOLVES
Issue owner
TIME LIMIT
Logged on the day it is raised
STEP 2
Resolve in the workstream
If the issue sits within one workstream and the current baseline, the workstream lead closes it.
WHO RESOLVES
Workstream lead
TIME LIMIT
5 working days
STEP 3
Escalate to the project director
If it crosses workstreams or the baseline, the DKC project director resolves it.
WHO RESOLVES
DKC project director
TIME LIMIT
10 working days
STEP 4
Steering committee
If it changes scope, budget, risk allocation, or a stage date, the owner's steering committee decides.
WHO RESOLVES
Owner's steering committee
TIME LIMIT
Next committee or a special meeting
STEP 5
Close-out
Baseline, model, contracts, and schedule are updated; affected parties are notified; the independent engineer is informed where scoped.
WHO RESOLVES
DKC project director
TIME LIMIT
Recorded in the decision register
QUALITY REVIEW
Deliverables follow DKC's documented review procedure: review comments are logged and closed before a deliverable is issued for use.
STEP 1
Discipline review
Third-party deliverables are reviewed by DKC's discipline leads and checked against the interface register.
STEP 2
Originator, checker, approver
DKC's own documents pass a second professional's check and a director's approval; each issued model carries the cost-estimate revision it reflects.
STEP 3
Independent engineer
At the gates the owner or the lenders set, an independent engineer reviews the work and reports directly to them.
INDEPENDENCE
DKC also advises contractors and equipment suppliers on other projects, and many of our engineers come from EPC contractors. These rules keep that experience from becoming a conflict.
ONE SIDE PER PROJECT
No work for bidders on the same project
Once DKC acts for an owner, it does not advise any bidder, contractor, or supplier on that project.
DISCLOSURE
Prior relationships disclosed
Before an engagement starts, DKC discloses any prior work for, or recent employment with, parties likely to bid or supply, and the owner decides how to handle it.
SEPARATE REVIEW
No review of our own work
Independent review of DKC's studies is carried out by an engineer outside DKC, appointed by the owner or the lenders.
See how this applies to each of our services.