Engineering Management & Technical Advisory

Owner-side engineering coordination and technical review for coal-fired power plants and carbon capture facilities, with particular emphasis on integration across critical interfaces.

Engineering Management & Technical AdvisoryCommercial & Contract AdvisoryFinancial Advisory & Capital RaisingBankable Feasibility & Project Development

DKC manages the engineering for the owner: it sets the design basis, coordinates the packages, reviews every deliverable, and resolves the interfaces between them before they reach the EPC tender.

WHY IT MATTERS

On a coal-fired power plant with carbon capture, the capture facility draws steam, power, and cooling water from the host plant and returns a lower net output. Each of these links moves the heat balance, the cost estimate, and the tariff the project needs.

Left to separate packages, these interfaces are settled late, by contractors, at the owner's cost. DKC holds them on the owner's side from the design basis onward, supported by specialist engineering firms for design, with an independent engineer reviewing at agreed gates.

WHAT THE OWNER GETS

  • ✓One approved design basis and battery-limit schedule for plant and capture facility
  • ✓Interfaces frozen before EPC award, with their cost and performance effect priced
  • ✓Every deliverable reviewed and closed out against a single comment register
  • ✓Technical bid packages consistent with the EPC risk allocation

WHAT WE DO

Owner-side engineering for power and carbon capture

01

Design basis and configuration

Site, configuration, and design basis for the plant and the boiler / CFBC; functional specifications that the design firms work to.

02

Capture technology screening

Capture technologies and configurations compared against host-plant constraints, performance, cost, and supplier guarantees.

03

Host-plant integration

Steam, power, cooling water, flue gas, and CO₂ battery limits defined between the power plant and the capture facility.

04

Package coordination

Scopes of work for specialist consultants, an integrated engineering schedule, and interface meetings chaired on the owner's behalf.

05

EPC scope and bid evaluation

The technical volume of the bid package, technical and commercial bid evaluation, and contractor design review.

06

Commissioning and performance

Review of commissioning plans and performance tests against the guarantees in the EPC and supply contracts.

CRITICAL INTERFACES

The links that decide net output and cost

These are the battery limits DKC resolves between the host plant and the capture facility before the EPC award.

INTERFACE

WHAT CROSSES IT

WHAT IT CHANGES

LEAD DISCIPLINES

Flue gas

Flue gas from the boiler to the capture plant

Duct routing, fan duty, and pre-treatment scope

Boiler; CCS process; civil

LP steam extraction

Steam for solvent regeneration

Turbine output, heat balance, and net efficiency

Boiler / turbine; CCS process

Auxiliary power

Electricity for capture, compression, and pumps

Net export, switchyard and auxiliary system sizing

Electrical

Cooling water

Cooling for capture and compression

Cooling system capacity and water balance

Civil; mechanical; environmental systems

CO₂ delivery

Captured CO₂ to compression, transport, and storage

Specification, pressure, metering, and liability point

CCS process; commercial

QUALITY REVIEW

A documented review procedure for every deliverable

Deliverables follow DKC's documented review procedure: review comments are logged and closed before a deliverable is issued for use.

STEP 1

Discipline review

Third-party deliverables are reviewed by DKC's boiler / CFBC, CCS, electrical, I&C, civil, environmental, and cost leads, then checked against the interface register.

STEP 2

Originator, checker, approver

DKC's own documents pass a second professional's check and a director's approval; each issued model carries the cost-estimate revision it reflects.

STEP 3

Independent engineer

At the gates the owner or the lenders set, an independent engineer outside DKC reviews the design and procurement and reports directly to them.

HOW WE WORK

From design basis to preferred bidder

STEP 1

Design basis and scope

Consolidate owner's requirements and site data; define battery limits and the package split.

DELIVERABLE

Design basis; package split

DECISION GATE

Owner approves the design basis

STEP 2

Package coordination

Draft scopes for specialist firms; run the integrated engineering schedule.

DELIVERABLE

Scopes of work; master schedule

DECISION GATE

Deliverables issued against the register

STEP 3

Review and interfaces

Discipline reviews; chair interface meetings; close comments.

DELIVERABLE

Comment register; interface schedule

DECISION GATE

All comments closed; interfaces frozen

STEP 4

Specifications and bid packages

Assemble the technical volume; align it with the EPC risk allocation.

DELIVERABLE

Technical bid package

DECISION GATE

Cross-checked by commercial and financial leads

STEP 5

Bid evaluation

Evaluate technical and commercial bids; prepare the execution plan.

DELIVERABLE

Bid evaluation report; execution plan

DECISION GATE

Preferred bidder recommended

EXPERIENCE BEHIND THIS SERVICE

DKC's engineering management team brings design, construction, and commissioning experience on large coal-fired units, circulating fluidized bed boilers, and a commercial carbon capture plant, gained before joining DKC.

Team experience →  Our people →

Discuss how DKC can support your project on the owner's side.