Every project agreement allocates risk, and the allocations must fit together. DKC reviews each agreement against the same technical baseline and the same financial model.
WHY IT MATTERS
A power and carbon capture project rests on a set of agreements: power purchase, EPC, equipment supply and service, fuel supply, CO₂ transport and storage, and O&M. A gap between any two of them becomes a risk that lenders will price or refuse.
DKC's project director leads the review, discipline leads check the technical terms, and the financial team tests each allocation in the model, so that the agreements, the design, and the financing stay consistent.
WHAT THE OWNER GETS
WHAT WE DO
01
Contract strategy
Contract structure and package strategy matched to the project's risk profile and financing plan.
02
Risk allocation
Each project risk identified and assigned to the party best able to carry it, in one matrix across all agreements.
03
Term sheet and draft review
Techno-commercial review of each draft; gaps flagged against the matrix and marked up for counsel.
04
Negotiation support
Negotiation positions and fallbacks; attendance at negotiations with the owner and counsel.
05
EPC and supply terms
Scope completeness, performance guarantees, liquidated damages and caps, and completion tests.
06
Alignment check
Final terms compared across all agreements and against the model and lender terms.
REVIEW BY AGREEMENT
AGREEMENT
TECHNICAL
COMMERCIAL
FINANCIAL LINK
Power purchase / offtake
Capacity, availability, dispatch, testing regime
Tariff and indexation; change in law; termination
Revenue and debt service cover
EPC contract
Scope completeness; performance guarantees; completion tests
Fixed price; completion date; LDs and caps; security
CAPEX, drawdown, contingency
Equipment supply and service
Guaranteed output, heat rate, degradation
Warranty; service fees; liability caps
Major maintenance reserve; ECA eligibility
Fuel supply
Fuel specification, delivery point, metering
Volume commitment; price pass-through
Fuel cost pass-through; working capital
CO₂ transport and storage
CO₂ specification, pressure, delivery point
Capacity, availability, liability for stored CO₂
Storage fees; carbon-related revenues
O&M agreement
Scope split; availability and heat-rate KPIs
Fee structure; bonus and LDs; step-in
OPEX; operator incentives
HOW WE WORK
STEP 1
Risk allocation matrix
Identify project risks and assign each to the party best able to carry it.
DELIVERABLE
Risk allocation matrix; contract structure
DECISION GATE
Matrix approved by the owner
STEP 2
Term sheet and draft review
Techno-commercial review of each draft against the matrix.
DELIVERABLE
Issues list per agreement; mark-ups to counsel
DECISION GATE
Issues ranked and assigned
STEP 3
Negotiation support
Prepare positions and fallbacks; attend negotiations.
DELIVERABLE
Position papers; record of agreed terms
DECISION GATE
Key terms agreed
STEP 4
Back-to-back check
Compare final terms across agreements, the model, and lender terms.
DELIVERABLE
Alignment table; open-gap list
DECISION GATE
No open gap affecting bankability
SELECTED PROJECTS
Upgrading the Dumai refinery, Indonesia
KEXIM · 2023.05 – 2024.05
Yen Binh waste-to-energy, Vietnam
Samsung E&A · 2022.05 – 2022.07
Sulawesi 30 MW small hydropower, Indonesia
Dohwa Engineering · 2021.12 – 2022.04
Phou Ngoy Mekong hydropower, Laos
Dohwa Engineering · 2021.11 – 2022.05
Structuring the financing case for a 4,500 MW LNG-to-power complex, Vietnam
KEXIM · 2020.12 – 2021.12
Kyrgyz State Medical Academy hospital, Bishkek
KIND · 2019.04 – 2019.08
Discuss how DKC can support your project on the owner's side.
CONTACT US