A bankable feasibility study answers one question for owners, lenders, and public financiers: can this project be built, operated, and financed on the terms assumed? DKC leads the study and is accountable for that answer.
WHY IT MATTERS
Feasibility and bankability work is the core of DKC's track record. Since 2016, most of our mandates have been feasibility studies, and most of those were commissioned by Korea's public financiers and agencies: KEXIM, Korea's export credit agency, KIND, and KEITI. These institutions use the studies to decide whether to lend to, invest in, or support a project, so the work is written for a credit decision, not for promotion.
A study is bankable only when its engineering, cost estimate, schedule, market case, contract structure, and financial model agree with each other. DKC's role is to lead and integrate those workstreams on one baseline. Engineering deliverables are prepared by DKC's discipline leads and, where the scope requires, by specialist design firms working under DKC's coordination; the result is then open to review by an independent engineer acting for the owner or the lenders.
WHAT THE OWNER GETS
WHAT A BANKABLE STUDY CONTAINS
A bankable feasibility study is a multi-discipline deliverable. This is how the work is divided on a power or carbon capture project.
STUDY COMPONENT
WHAT LENDERS AND FINANCIERS LOOK FOR
PREPARED BY
DKC'S ROLE
Design basis and technical concept
Proven configuration; performance and guarantees consistent with the tariff
DKC discipline leads; specialist design firms and technology suppliers for process and equipment data
Sets the design basis; reviews and integrates all technical inputs
Capital and operating cost estimate
Estimate class and contingency appropriate to the stage; EPC and O&M budget quotes
DKC project controls and cost lead, with supplier and contractor budget quotes
Builds and owns the estimate; reconciles it with the model
Schedule and execution plan
Credible path to commercial operation; long-lead items identified
DKC construction planning and execution leads
Prepares the schedule and execution strategy
Market and offtake
Creditworthy offtake; price and volume cases with downside
DKC market and financial team
Prepares the market and offtake analysis
Contracts and risk allocation
Each risk placed with the party best able to carry it
DKC commercial team, with the owner's legal counsel
Prepares the contract structure and risk matrix
Financial model and financing plan
Debt capacity, coverage ratios, and sensitivities on audited logic
DKC financial team
Builds the model and the financing plan
Permitting, environmental, and legal
A permitting path and no unpriced legal or environmental exposure
Specialist consultants and counsel in the host country
Scopes, coordinates, and reflects their findings in the study
Independent review
An engineer independent of the study team confirms its conclusions
Independent engineer for the owner or the lenders
Supports the review and closes its comments
Specialist firms and counsel are engaged for each project according to its location and technology.
TRACK RECORD
MARKET
EXAMPLES OF DKC FEASIBILITY WORK
COMMISSIONED BY
Carbon capture and low-carbon fuels
Blue ammonia with carbon capture, Alberta (lead consultant); green hydrogen and ammonia in Oman, the UAE, Australia, and Canada
KIND, KEITI, KEXIM
Power generation
LNG-to-power and gas-to-power in Vietnam, Cameroon, the Philippines, and the Dominican Republic; solar and battery storage in the US, Ireland, and Australia
KEXIM, KIND, KOGAS, KEITI
Environmental infrastructure
District heating modernization in Uzbekistan; medical waste-to-energy in Tashkent
KEXIM, KEITI
Industrial and infrastructure
Refinery upgrade at Dumai, Indonesia; container inspection facility BOT, Sri Lanka
KEXIM, KIND
SELECTED PROJECTS
Pre-feasibility study for green hydrogen and ammonia, Dubai
KEITI · 2023.07 – 2024.01
Townsville battery storage, Queensland, Australia
KEITI · 2026.04 –
Solar PV and battery storage development, Texas, USA
KEITI · 2025.11 – 2026.06
Kochkor solar power, Kyrgyzstan
KEITI · 2025.09 – 2026.06
Blue ammonia with carbon capture, Alberta, Canada
KIND · 2025.05 – 2025.10
Sustainable aviation fuel development, Indonesia
KEXIM · 25.03.28 –