DKC carried out KEITI's feasibility study for the 300 MWp Kochkor solar power project in Kyrgyzstan.
ABOUT THE PROJECT
Kyrgyzstan's power system depends heavily on hydropower: large plants such as Toktogul, Kurpsai and Tash-Kumyr provide up to 85% of generation. When winter water inflows fall, the load on thermal and combined heat and power plants rises sharply, and the country has faced winter shortfalls and rolling blackouts in dry years. New solar capacity is one way to diversify a supply that depends on river flows.
Renewable development is governed by the Law on Renewable Energy Sources of June 30, 2022, administered by the Ministry of Energy. The state guarantees purchase of qualifying renewable output, with a tariff linked to the average end-consumer tariff during the payback period and capped by a ministry ceiling. Large and medium projects are allocated through state tenders in which investors compete on the lowest price per kWh.
DKC'S ROLE
Feasibility study for KEITI.
Scope
- Market and offtake review
- Project financial model
- Financing structure
- Risk and sensitivity analysis
CASE STUDY
THE CHALLENGE
KEITI needed a feasibility study on a 300 MWp solar project in Kochkor, Kyrgyzstan, a market where large-scale solar is new and the offtake and financing framework is still developing.
THE SOLUTION
DKC's feasibility study reviewed the market and offtake arrangements, built the project financial model, and tested the financing structure and the main risks.
THE RESULT
Feasibility study delivered to KEITI (September 2025 to June 2026).
WHAT IT MEANS FOR CLIENTS Utility-scale solar assessed in an early-stage Central Asian market, where offtake and currency risk shape the financing case.
PUBLIC INFORMATION ON THE PROJECT
- National Investment Agency of the Kyrgyz Republic — Energy sector overview ↗
- IEA — Strengthening Power System Security in Kyrgyzstan: A Roadmap, policy context (2022) ↗
"About the project" summarizes published information on the project and its market. It does not describe DKC's findings; DKC's role is described separately above.