DKC carried out KEITI's feasibility study on a green hydrogen development at the Port of Brisbane, Queensland.
ABOUT THE PROJECT
A green hydrogen production and refuelling hub is being developed at the Port of Brisbane in Queensland, aimed at heavy-vehicle fleets such as public buses and trucks. A joint development agreement among the hub's partners was signed in August 2024, under which the project is to be developed and the hydrogen sold in the Australian domestic market.
The hub is planned around two 1 MW alkaline electrolysers producing about 850 kg of hydrogen a day, or more than 300 tonnes a year, for the Australian domestic market. At signing, the site lease and the relevant government approvals were in place, with the start of construction subject to the partners' agreement.
DKC'S ROLE
Feasibility study for KEITI.
Scope
- Feasibility study
- Market review
- Financial analysis
- Risk review
CASE STUDY
THE CHALLENGE
KEITI needed a feasibility study on a green hydrogen development at the Port of Brisbane, to assess whether the project could be delivered and financed.
THE SOLUTION
DKC carried out the feasibility study, reviewing the project's market, economics, and the main risks to its financing case.
THE RESULT
Feasibility study delivered to KEITI (engagement November 2024 to July 2025).
WHAT IT MEANS FOR CLIENTS Small, domestic-market hydrogen hubs rest on offtake from fleet operators, and owners need that demand case tested before scaling up.
PUBLIC INFORMATION ON THE PROJECT
- pv magazine — Green hydrogen hub planned at the Port of Brisbane (Aug 2024) ↗
- Etoday — Port of Brisbane green hydrogen hub agreement (Aug 2024, Korean) ↗
"About the project" summarizes published information on the project and its market. It does not describe DKC's findings; DKC's role is described separately above.