Aramco cogeneration projects (PCPC), Saudi Arabia

DKC provided arbitration advisory services to Samsung Engineering (now Samsung E&A) on the 876 MW Aramco cogeneration projects of the Power Cogeneration Plant Company (PCPC).

ABOUT THE PROJECT

The Power Cogeneration Plant Company (PCPC) was set up for Saudi Aramco's third-party cogeneration project: three plants at the Abqaiq, Hawiyah, and Ras Tanura oil and gas facilities supplying a combined 876 MW of power and 3.26 million lb/hr of steam to Aramco. The contracts were signed in August 2013 with a consortium of Marubeni, JGC, and Aljomaih, with Aramco holding 50%, for 20 years of operation. The project, estimated at about US$650 million, reached financial close in January 2014, with Samsung Engineering as EPC contractor. The Ras Tanura plant began commercial operation in August 2017.

DKC'S ROLE

Arbitration advisory for Samsung Engineering (now Samsung E&A).

Scope

  • Arbitration support
  • Financial and quantum analysis
  • Review of contract records

CASE STUDY

THE CHALLENGE

Samsung Engineering, as EPC contractor on the PCPC cogeneration plants, needed advisory support in an arbitration related to the projects.

THE SOLUTION

DKC provided arbitration advisory services, supporting Samsung Engineering's analysis of its position in the dispute.

THE RESULT

Arbitration advisory delivered to Samsung Engineering (July 2017).

WHAT IT MEANS FOR CLIENTS  Experience of how large EPC contracts are tested in dispute, which informs how an owner sets up contracts and records from the start.