DKC provided financial advisory to Samsung Engineering (now Samsung E&A) on Kuwait Oil Company's Jurassic Production Facilities 4 and 5.
ABOUT THE PROJECT
Kuwait Oil Company's Jurassic Production Facilities 4 and 5 (JPF-4 and JPF-5) process wet and sour well fluids from North Kuwait's Jurassic reservoirs. Each facility is designed to produce about 150 million cubic feet a day of sweet gas and 50,000 barrels a day of treated light crude. JPF-4 is near the Sabriyah field, and JPF-5 lies less than 10 km to its east.
KOC tendered the facilities on a build-own-operate basis, with an option to buy them back later, and received bids in April 2021. In December 2021 contracts were signed with Spetco for JPF-4 (about US$398 million) and with China's Jereh for JPF-5 (about US$426 million), each to operate and maintain its facility for five years.
DKC'S ROLE
Financial advisory for Samsung Engineering (now Samsung E&A).
Scope
- Financial advisory
- Financial model
- Review of the build-own-operate structure
CASE STUDY
THE CHALLENGE
Samsung Engineering was assessing KOC's tender for JPF-4 and JPF-5, structured as build-own-operate, and needed financial advice on the investment case.
THE SOLUTION
DKC provided financial advisory on the project, covering the economics of building, owning, and operating the facilities under the tender terms.
THE RESULT
Financial advisory delivered to Samsung Engineering (December 2020 to March 2021).
WHAT IT MEANS FOR CLIENTS When an EPC contractor is asked to own and operate, the bid turns on financial terms as much as on engineering.
PUBLIC INFORMATION ON THE PROJECT
- MEES — Kuwait receives bids for $1bn Jurassic gas production facilities (May 2021) ↗
- Offshore Technology — Kuwait confirms lowest bidder for Jurassic projects (Apr 2021) ↗
- Offshore Technology — Kuwait signs $398m Jurassic gas contract (Dec 2021) ↗
"About the project" summarizes published information on the project and its market. It does not describe DKC's findings; DKC's role is described separately above.