DK Consultants
ENKOCONTACT

PROJECTS  /  INDUSTRIAL & INFRASTRUCTURE

Jurassic Production Facilities 4 and 5, North Kuwait

DKC provided financial advisory to Samsung Engineering (now Samsung E&A) on Kuwait Oil Company's Jurassic Production Facilities 4 and 5.

ABOUT THE PROJECT

Kuwait Oil Company's Jurassic Production Facilities 4 and 5 (JPF-4 and JPF-5) process wet and sour well fluids from North Kuwait's Jurassic reservoirs. Each facility is designed to produce about 150 million cubic feet a day of sweet gas and 50,000 barrels a day of treated light crude. JPF-4 is near the Sabriyah field, and JPF-5 lies less than 10 km to its east.

KOC tendered the facilities on a build-own-operate basis, with an option to buy them back later, and received bids in April 2021. In December 2021 contracts were signed with Spetco for JPF-4 (about US$398 million) and with China's Jereh for JPF-5 (about US$426 million), each to operate and maintain its facility for five years.

DKC'S ROLE

Financial advisory for Samsung Engineering (now Samsung E&A).

Scope

  • Financial advisory
  • Financial model
  • Review of the build-own-operate structure

CASE STUDY

THE CHALLENGE

Samsung Engineering was assessing KOC's tender for JPF-4 and JPF-5, structured as build-own-operate, and needed financial advice on the investment case.

THE SOLUTION

DKC provided financial advisory on the project, covering the economics of building, owning, and operating the facilities under the tender terms.

THE RESULT

Financial advisory delivered to Samsung Engineering (December 2020 to March 2021).

WHAT IT MEANS FOR CLIENTS  When an EPC contractor is asked to own and operate, the bid turns on financial terms as much as on engineering.

PUBLIC INFORMATION ON THE PROJECT

"About the project" summarizes published information on the project and its market. It does not describe DKC's findings; DKC's role is described separately above.

RELATED PROJECTS · INDUSTRIAL & INFRASTRUCTURE

All Industrial & Infrastructure projects →