Container inspection facility for Sri Lanka Customs

DKC carried out KIND's feasibility study on a container inspection facility for Sri Lanka Customs, planned on a build-operate-transfer (BOT) basis.

ABOUT THE PROJECT

Sri Lanka Customs examines imported sea cargo through its Central Cargo Examination Directorate, which selects containers by risk. High-risk full container loads go to a dedicated unit at Grayline Yard I in Orugodawatta, medium-risk cargo to Grayline Yards I and II, and low-risk cargo to the Rank Container Terminal. Customs lists four scanners operating around the clock at Colombo Port and the Rank Container Terminal, used mainly to speed clearance of low-risk cargo.

Physical inspection capacity remains limited. In October 2026, after a large drug seizure at Colombo Port, the Public Security Minister announced plans to introduce container scanners at the country's ports. Officials said about 35 percent of imports are physically examined and the rest are cleared without physical scrutiny, that capacity for high-risk cargo had been capped at about 500 containers a day, and that Colombo handles 1,500 to 3,000 units a day.

DKC'S ROLE

Feasibility study for KIND.

Scope

  • Feasibility study
  • Demand review
  • BOT structure and financial analysis
  • Risk review

CASE STUDY

THE CHALLENGE

KIND needed a feasibility study on a container inspection facility for Sri Lanka Customs, to be delivered on a BOT basis, to judge whether the project could work for a private investor.

THE SOLUTION

DKC carried out the feasibility study, reviewing inspection demand, the BOT structure, and the project's economics and risks.

THE RESULT

Feasibility study delivered to KIND (engagement April to November 2022).

WHAT IT MEANS FOR CLIENTS  Public-service BOT projects depend on how the revenue mechanism is designed, which a feasibility study must test first.

PUBLIC INFORMATION ON THE PROJECT

"About the project" summarizes published information on the project and its market. It does not describe DKC's findings; DKC's role is described separately above.

RELATED PROJECTS · INDUSTRIAL & INFRASTRUCTURE

All Industrial & Infrastructure projects →