DKC carried out a pre-feasibility study for Samil PwC on the third package of Qatar's schools public-private partnership program, covering 14 schools.
ABOUT THE PROJECT
In February 2021 Qatar's Ministry of Commerce and Industry, with the Ministry of Education and Higher Education and the Public Works Authority (Ashghal), announced the third package of the Qatar Schools Public-Private Partnership Development Program and invited expressions of interest. The program covers 47 schools in four packages; at the time, the first package had been signed and the second launched.
The third package covers 14 schools: four secondary, five preparatory, and four primary schools, and one school for students with special needs. The private partner would design, build, and finance the schools, demolish vacated school buildings, and operate and maintain the facilities over a 25-year term, after which the assets transfer to the public authority.
DKC'S ROLE
Pre-feasibility study for Samil PwC.
Scope
- Pre-feasibility study
- PPP structure review
- Preliminary financial analysis
CASE STUDY
THE CHALLENGE
Samil PwC needed an early assessment of the third package of Qatar's schools PPP program, a 25-year design, build, finance, operate, and maintain concession for 14 schools.
THE SOLUTION
DKC carried out the pre-feasibility study, reviewing the PPP structure and the preliminary economics of the package.
THE RESULT
Pre-feasibility study delivered to Samil PwC.
WHAT IT MEANS FOR CLIENTS Availability-based social infrastructure PPPs are won or lost on long-term operating and lifecycle costs, which need to be understood before bidding.
PUBLIC INFORMATION ON THE PROJECT
"About the project" summarizes published information on the project and its market. It does not describe DKC's findings; DKC's role is described separately above.