DKC built the commercial operations model for Hanwha Energy's 200 MW battery storage projects in Ireland.
ABOUT THE PROJECT
Hanwha Energy and Irish developer Lumcloon Energy developed battery storage plants at Lumcloon and Shannonbridge in County Offaly, where construction began in 2019. Their legal adviser described the projects in 2020 as Ireland's largest battery energy storage systems, at 200 MW in total. According to Hanwha, the plants were completed in 2021 with financing from the Export-Import Bank of Korea.
Battery revenue in Ireland comes largely from system services. Under EirGrid's DS3 program, the grid operator pays for fast frequency response and primary, secondary and tertiary operating reserves, which allow it to run the system with up to 75% of instantaneous generation from wind and other non-synchronous sources. How often and how quickly a battery responds therefore drives its commercial performance.
DKC'S ROLE
Commercial operations modeling for Hanwha Energy.
Scope
- Commercial operations model
- System services revenue modeling
- Operating cost and performance assumptions
CASE STUDY
THE CHALLENGE
As its Irish battery storage projects moved into operation, Hanwha Energy needed a model of how the plants would earn revenue and perform commercially.
THE SOLUTION
DKC built the commercial operations model, covering grid system services revenues, operating costs, and performance assumptions.
THE RESULT
Commercial operations model delivered to Hanwha Energy (June to September 2021).
WHAT IT MEANS FOR CLIENTS An operating model that lets an owner track a storage asset against its investment case once it is running.
PUBLIC INFORMATION ON THE PROJECT
- Matheson — Hanwha Energy Corporation and Lumcloon Energy advised on developing Ireland's largest battery energy storage systems (Nov 2020) ↗
- Hanwha — Hanwha Energy promotes third energy storage system (ESS) project in Ireland (Oct 2022) ↗
- EirGrid — DS3 Programme: Delivering a Secure, Sustainable Electricity System ↗
"About the project" summarizes published information on the project and its market. It does not describe DKC's findings; DKC's role is described separately above.