DKC led KOGAS's feasibility study and financial model for participation in a 350–400 MW gas-to-power project at Manzanillo, delivered within three months.
ABOUT THE PROJECT
In March 2021 the Dominican Republic's Ministry of Energy and Mines opened an international tender (EDES-LPI-NG-01-2021) for two natural gas-fired combined-cycle plants at Manzanillo, on the country's north-west coast, together with a gas terminal with onshore storage sized for 800 MW of continuous operation. Each plant had to contract between 350 MW and 400 MW under a 15-year power purchase contract starting 36 months after signing.
DKC'S ROLE
Lead of the feasibility study for KOGAS, including tax and legal review and the financial model.
Scope
- Feasibility study
- Tax and legal review
- Financial model
- Tariff, fuel, and financing sensitivities
CASE STUDY
THE CHALLENGE
KOGAS was assessing participation in a 350–400 MW gas-to-power project at Manzanillo and needed a feasibility study and a financial model within three months.
THE SOLUTION
DKC led the study, covered tax and legal review, and built the financial model, testing tariff, fuel, and financing assumptions.
THE RESULT
Feasibility study and financial model delivered to KOGAS on schedule, giving the client a priced, risk-tested basis for its participation decision.
WHAT IT MEANS FOR CLIENTS A priced, risk-tested basis for an investment decision, delivered within a fixed timetable.