This is career experience of DKC team members with a previous employer (POSCO E&C (EPC)), before they joined DKC. It is not a DKC project.
Two 1,050 MW-class ultra-supercritical coal-fired units with a 345 kV transmission line.
ABOUT THE PLANT
Samcheok Blue Power is a coal-fired station of about 2,100 MW on Korea's east coast, built with two ultra-supercritical units of about 1,050 MW each. POSCO E&C and Doosan Heavy Industries (now Doosan Enerbility) invested in the project and formed the EPC consortium; the project company's shareholders are NongHyup Financial Group, POSCO Holdings, and Doosan Enerbility.
Unit 1 began test operation in 2023 and Unit 2 officially began operating in January 2025. Since then, limited transmission capacity from the east coast has constrained the plant's output.
WHAT STANDS OUT
DKC TEAM MEMBERS ON THIS PLANT
Namjin Park
DKC Technical Lead, Instrumentation & Controls
Project Manager and Project Director, at POSCO E&C
PUBLIC INFORMATION ON THE PLANT
POSCO E&C — Samcheok coal-fired power plant (project page) ↗