This is career experience of DKC team members with a previous employer (KEPCO E&C (architect-engineer)), before they joined DKC. It is not a DKC project.
Four 550 MWe ultra-supercritical CFB boilers: the world's largest CFB plant.
ABOUT THE PLANT
Samcheok Green Power is a 2,200 MW coal-fired plant owned by Korea Southern Power. Each of its two units has two 550 MWe once-through ultra-supercritical circulating fluidized bed boilers feeding a single 1,100 MW steam turbine. The boilers, contracted to Foster Wheeler in 2011, use vertical-tube Benson evaporators and produce steam at 603°C for both main and reheat.
Unit 1 entered service in December 2016 and Unit 2 in June 2017. The plant fires a wide range of imported coals and is designed to co-fire up to 5% biomass; it meets its sulfur oxide limit without flue gas desulfurization. It remains the world's largest CFB plant, with a reported net efficiency of about 42% (LHV).
WHAT STANDS OUT
DKC TEAM MEMBERS ON THIS PLANT
Young Hoon Ha
DKC Technical Lead, Boiler / CFBC
Mechanical Engineering Team Leader, at KEPCO E&C
PUBLIC INFORMATION ON THE PLANT
POWER — South Korean plant finds flexibility with advanced CFB technology ↗