DK Consultants
ENKOCONTACT

TEAM EXPERIENCE  /  GAS PROCESSING

Gas separation and gas processing plants

This is career experience of DKC team members with a previous employer (Samsung Engineering (now Samsung E&A)), before they joined DKC. It is not a DKC project.

Process engineering for PTT's gas separation plants in Thailand and other gas processing facilities.

ABOUT THE PLANT

PTT's sixth gas separation plant (GSP-6) at the Map Ta Phut complex in Rayong, Thailand, recovers ethane, propane, and other components from natural gas at a capacity of 800 million standard cubic feet a day. PTT awarded the EPC contract to Samsung Engineering, with Foster Wheeler as front-end engineering and project management consultant.

The plant was completed in 2010 and received the Project Management Institute's 2011 Distinguished Project Award. It was then the largest gas separation plant in the world by number of production-through-fractionation units.

WHAT STANDS OUT

  • —Large-scale gas separation, the process base for CO₂ capture and compression
  • —Lead process engineering on EPC delivery

DKC TEAM MEMBERS ON THIS PLANT

Kyong Jin Mun

DKC Executive Vice President · Technical Lead, CCS

Lead Process Engineer, at Samsung Engineering: PTT gas separation and ethane separation plants; Petronas / PTT Songkran gas separation; VOGC gas processing; LNG regasification

PUBLIC INFORMATION ON THE PLANT

Oil & Gas Journal — PTT lets contract for sixth gas-separation plant ↗

PMI — Samsung Engineering uses PMBOK Guide to implement integration methods (GSP-6 case study) ↗

MORE TEAM EXPERIENCE

All team experience →