This is career experience of DKC team members with a previous employer (KEPCO E&C (formerly KOPEC), architect-engineer), before they joined DKC. It is not a DKC project.
Design and commissioning of KEPCO's standardized 500 MW-class supercritical coal units.
ABOUT THE PLANT
In the 1990s KEPCO standardized its coal-fired fleet on a once-through supercritical unit design with variable-pressure operation, built in series at Hadong, Dangjin, Taean, and other sites. KEPCO's engineering subsidiary KOPEC, now KEPCO E&C, was the prime architect-engineer, and Hanjung, now Doosan Enerbility, was the lead equipment supplier.
At Hadong, construction began in 1993; units 1 and 2 entered commercial operation in 1997 and the six-unit, 3,000 MW plant was completed in November 2001. At Dangjin, the first units entered service in 2000 and 2001.
WHAT STANDS OUT
DKC TEAM MEMBERS ON THIS PLANT
Young Jong Youn
DKC Technical Lead, Civil
Civil design and commissioning: Dangjin 8 × 500 MW, Taean 8 × 500 MW, Hadong 6 × 500 MW, at KEPCO E&C
Ho Gi Kim
DKC Technical Lead, Electrical
Responsible electrical engineer, Taean; electrical group supervisor, Boryong, Dangjin, West Incheon, and Ulsan, at KEPCO E&C
Young Hoon Ha
DKC Technical Lead, Boiler / CFBC
Engineer, Hadong Units 7 & 8 (ministerial commendation, 2009), at KEPCO E&C
PUBLIC INFORMATION ON THE PLANT