DK Consultants
ENKOCONTACT

TEAM EXPERIENCE  /  500 MW COAL-FIRED UNITS

Korea standard coal-fired units: Dangjin, Taean, and Hadong

This is career experience of DKC team members with a previous employer (KEPCO E&C (formerly KOPEC), architect-engineer), before they joined DKC. It is not a DKC project.

Design and commissioning of KEPCO's standardized 500 MW-class supercritical coal units.

ABOUT THE PLANT

In the 1990s KEPCO standardized its coal-fired fleet on a once-through supercritical unit design with variable-pressure operation, built in series at Hadong, Dangjin, Taean, and other sites. KEPCO's engineering subsidiary KOPEC, now KEPCO E&C, was the prime architect-engineer, and Hanjung, now Doosan Enerbility, was the lead equipment supplier.

At Hadong, construction began in 1993; units 1 and 2 entered commercial operation in 1997 and the six-unit, 3,000 MW plant was completed in November 2001. At Dangjin, the first units entered service in 2000 and 2001.

WHAT STANDS OUT

  • —A standardized design built in series across several sites
  • —Design through commissioning on the owner's architect-engineer team

DKC TEAM MEMBERS ON THIS PLANT

Young Jong Youn

DKC Technical Lead, Civil

Civil design and commissioning: Dangjin 8 × 500 MW, Taean 8 × 500 MW, Hadong 6 × 500 MW, at KEPCO E&C

Ho Gi Kim

DKC Technical Lead, Electrical

Responsible electrical engineer, Taean; electrical group supervisor, Boryong, Dangjin, West Incheon, and Ulsan, at KEPCO E&C

Young Hoon Ha

DKC Technical Lead, Boiler / CFBC

Engineer, Hadong Units 7 & 8 (ministerial commendation, 2009), at KEPCO E&C

PUBLIC INFORMATION ON THE PLANT

Power Technology — Hadong coal-fired power plant ↗

Power Technology — Dangjin coal-fired power plant ↗