TEAM EXPERIENCE  /  COAL-FIRED EPC, CHILE

Nueva Ventanas power plant, Ventanas, Chile

This is career experience of DKC team members with a previous employer (POSCO E&C (EPC)), before they joined DKC. It is not a DKC project.

About 270 MW coal-fired unit built next to the existing Ventanas units in central Chile.

ABOUT THE PLANT

Nueva Ventanas is a coal-fired unit of about 270 MW built next to the existing Ventanas units on Chile's central coast. POSCO E&C signed the contract with AES Gener in 2006 and the unit entered operation in 2010.

In December 2025 Chile's National Energy Commission used October 2030 as a reference retirement date for Nueva Ventanas and the neighboring Campiche unit in its planning models.

WHAT STANDS OUT

  • —Brownfield construction beside operating units
  • —Part of a four-plant program delivered in Chile by the same team

DKC TEAM MEMBERS ON THIS PLANT

Myong-heon Han

DKC OSBL Integration & Execution Planning Lead

Project Manager and Mechanical Lead Engineer, at POSCO E&C

Hyoseok Seo

DKC Technical Lead, Environmental Systems

Environmental Lead Engineer and Construction Manager, at POSCO E&C

Won Suc Kim

DKC EPC Engagement Lead

Country Manager, Chile, at POSCO E&C

PUBLIC INFORMATION ON THE PLANT

Industrial Info — Korea's POSCO awarded two contracts for power projects in Chile ↗

Global Energy Monitor — Ventanas power station ↗